콘텐츠로 건너뛰기
✨ Olgax POS v0.1 MVP가 출시되었습니다. 무료 및 오픈소스!GitHub에서 별표
OlgaxOlgax

Reorder Point (ROP) & Safety Stock Calculator

Never run out of stock. Calculate the optimal reorder point based on lead time and daily sales.

카테고리:소매 및 POS
소매 및 POS

Reorder Point (ROP) & Safety Stock Calculator

Prevent stockouts and overstock

Never run out of stock. Calculate the optimal reorder point based on lead time and daily sales.

Average units sold per day

Days to receive order from supplier

0%25%50%
15%

Extra buffer for demand spikes (recommended: 10-25%)

재주문점 분석

Lead Time Demand

140 units

Units needed during supplier lead time

Safety Stock

21 units

Buffer for demand spikes (15%)

Reorder Point

161 units

Reorder when inventory reaches this level

실제 예제

📦 Coffee Shop (Fast-Moving Item)

  • • Daily sales: 50 bags of coffee
  • • Lead time: 3 days
  • • Safety buffer: 20%
  • ROP: 180 bags
  • Reorder when you drop to 180 bags to avoid running out

🎬 Electronics Store (Slow-Moving Item)

  • • Daily sales: 2 laptops
  • • Lead time: 14 days
  • • Safety buffer: 25%
  • ROP: 35 units
  • Longer lead time means higher ROP to prevent stockouts

재고 관리 및 주문

The Reorder Point (ROP) is the inventory level at which you should place a new order with your supplier. It ensures you always have enough stock to meet customer demand while your new shipment is in transit.

공식:

Your reorder point formula is simple: (Average Daily Usage x Lead Time) + Safety Stock. This prevents stockouts while minimizing holding costs.

Safety Stock is extra inventory to buffer against unexpected demand spikes or supplier delays. Retailers typically use 10-25% for fast-moving items and 20-50% for items with unpredictable demand.

💡 💡 전문가 팁: Adjust safety buffer seasonally. Increase it before busy seasons (holiday, back-to-school) and decrease during slow periods.

Automate Inventory Management

Olgax POS automatically tracks inventory and alerts you when to reorder, preventing stockouts and overstock situations.